Sheld delivers your cabinet. You arrange the fitting, and any competent tradesperson can do it. Your battery installer is a natural choice, because they'll be connecting the battery anyway. Share this page with them before fitting day so you're both working from the same plan.
Before you order
- Check the size. Find your fit suggests a size from your battery's make and model. Sizes are external, so ask your installer to check it against your battery maker's clearances before you order.
- Agree the spot. Your installer will want the battery near your inverter and consumer unit, to keep cable runs short. UK fire-safety guidance, PAS 63100:2024, favours an outdoor spot where it's practicable, at least 1 metre from doors, windows, escape routes and ventilation openings.
- Not on the list? If your battery isn't listed in Find your fit, we build to measure.
When it arrives
Your cabinet arrives pre-built, in one piece, ready to fit. There's nothing to assemble.
On fitting day
A firm, level base
The cabinet stands on four steel levelling feet, which take up small differences in the ground. Set it on a firm, level surface such as a paving slab or patio.
Room around it
- Leave room for the door to open fully. It's hinged on the left and locks on the right.
- Keep the side vents clear. AirFlow needs air to move freely through the cabinet.
- Leave the clearances your battery maker asks for, inside and out.
Cables
Plan the cable route between the cabinet, your inverter and your consumer unit with your installer, so it's neat and protected.
The panels don't conduct electricity, so there's no live-surface risk for your family or your installer.
Questions on the day?
Call us on +44 (0) 3030 031322, or send us a message, and a real person will help.





